C2

Project Status

Last Updated: November 4, 2011

Project Name, Contract Number: Contract C2, State Project Nos. 92-533/92-569

Project Area: I-95 / Fulton Terrace to Frontage Road

Project Scope: Contract C2 included the reconstruction of approximately 1,500 meters (1.0 mile) of I-95 from the western project limit just east of Stiles Street in New Haven to the eastern project limit at the New Haven/East Haven town line. The project included the reconfiguration of Interchange 49 and Interchange 50 into a single interchange accessed by a connector road between Stiles Street and Woodward Avenue.

The completed reconstruction can accommodate five travel lanes in each direction from the western project limit to the reconfigured Stiles/Woodward Interchange, and from that point four travel lanes to the eastern project limit. Full shoulders and a new median barrier are provided throughout the project. Replacement/rehabilitation of five bridges, construction of retaining walls, new drainage systems, signing and lighting were also included.

Project Designer: Close, Jensen & Miller, P.C. / URS Corp.

Project Contractor: O & G Industries, Inc.

Contract Milestones:
Begin Construction - September 26, 2005
Finish Construction - October 6, 2008

Progress Summary:
Construction of Contract C2 is complete.

Explore Further:

Traffic Image Photo Gallery >
See Contract C2 Photos as well as other Program Photos
Traffic Image Interactive Map >
Get the latest information on traffic alerts and detours.
Traffic Image Video >
Watch a simulation of cars driving through the completed interchange and onto the Pearl Harbor Memorial Bridge.
Traffic Image Video >
Watch a simulation of cars driving over the completed Pearl Harbor Memorial Bridge.
Traffic Image Video >
Watch the steel installation for the new Route 34 Flyover Bridge.